SHOP TOUR |
|||
|
Left: The sides are placed in the mold to be
trimmed Below: The head and tail blocks are glued |
||
|
|||
|
After the kerfing has been glued to the sides, the top is fit and the braces let into the kerfing. |
||
|
Left: The top is glued to the sides |
||
Above and Right: Theses router jigs handle the task of routing the ledges for bindings and purflings. |
![]() |
||
Left: The end graft is routed and installed before the bindings. |